Installation
Drip Irrigation Installation Guide: Step by Step
Proper drip installation determines uniformity and system life. SERTSAN compression fittings and pipes ship with ISO-aligned installation procedures.
30 dk
Test duration
1,5x
Test pressure
Installation steps
1) Filter and regulator 2) Main line 3) Lateral connections 4) Pressure test (1.5x operating, 30 min) 5) Flush and commissioning.
Frequently asked questions
- When to pressure test?
- After all connections, before burying lines — mandatory.
- Compression fitting torque?
- Follow catalog values; over-tightening deforms seals.